ORIGINALLY BUILT IN LATE 1986 IT WAS DECIDED IT WAS TIME FOR A FACE LIFT OR MAYBE MORE

Dec 1986

 

 

1 Jan 2007 - Started the demolition

 

26 Feb - Playing with ideas

   

 

  

 

21 June

21 June          11:15

21 June          14:50

 

 

 

 

 

Granite Called "Yellow Moon"

 

21 June             Template Time For The Granite

July 01 - Possible Flooring

July 10 - Countertop at the granite fabricators

July 15 - The day before the countertops arrive

 

17 July

The Granite Arrives

 

  

The Prep-Work

Putting In The Breakfast Bar

Surgery On The Island

What A Difference From Last Week

 

26 Aug        Night Lighting

 

  

 

Click Here To See The Ceiling Photos

tos

Finally The Track Lighting Goes Up

   

 

Links

Ceilings Being Stripped and Skip Troweled

Wood Floor For Kitchen - Dinning Areas

Kitchen Lighting