ORIGINALLY BUILT IN LATE 1986 IT WAS DECIDED IT WAS TIME FOR A FACE LIFT OR MAYBE MORE
Dec 1986

1 Jan 2007 - Started the demolition
26 Feb - Playing with ideas


21 June

21 June 11:15

21 June 14:50






Granite Called "Yellow Moon"
21 June Template Time For The Granite


July 01 - Possible Flooring
July 10 - Countertop at the granite fabricators

July 15 - The day before the countertops arrive
17 July
The Granite Arrives

The Prep-Work

Putting In The Breakfast Bar

Surgery On The Island

What A Difference From Last Week




26 Aug Night Lighting


Click Here To See The Ceiling Photos
Finally The Track Lighting Goes Up
![]()

Links
Ceilings Being Stripped and Skip Troweled
Wood Floor For Kitchen - Dinning Areas